What is a digital twin (warehouse simulation)?

A working virtual copy of a warehouse and its automated line. This page explains which decisions warehouse simulation tests and what to ask from the model before you invest.

In short

  1. Data collection: Building plan, order profile, carton data, peak-hour volume and shift pattern are collected.
  2. 3D layout: The line is placed on the building plan; columns, docks and fire compartments enter the model.
  3. Flow model: Conveyor speeds, merges, sorter chutes and operator stations are brought to life.
  4. Scenarios: Average day, peak hour, growth and failure scenarios are run.
  5. Decision and validation: The layout is adjusted to the results; the same model can be used to test the control software.

Definition

A digital twin is a virtual copy of a warehouse or automated line that runs on a computer. Layout, equipment and business rules are rebuilt one-to-one in the model. In warehouse projects it is often used for simulation before investment. The peak-hour volume runs through the model before the line is built. Bottlenecks, queues and undersized chutes become visible before equipment is ordered.

Other names: warehouse simulation, 3D simulation, material flow simulation. A model connected to the control software is also called emulation.

Simulation, emulation, digital twin

These three terms are often confused. The difference is what the model is connected to:

What does it model? Connected to When is it used?
Simulation Layout and flow Assumed order data Quotation and design stage
Emulation A virtual copy of the equipment Real PLC and control software Software testing, before FAT
Digital twin (narrow sense) A live copy of the running site Real-time data from the floor Trying changes during operation

In warehouse automation, "digital twin" is often used for the first two meanings as well. Ask which one the model is when you get a quotation. Layout animation, flow simulation and emulation do not give the same confidence.

How warehouse simulation is done: 5 steps

  1. Data collection: Building plan, order profile, carton data, peak-hour volume and shift pattern are collected.
  2. 3D layout: The line is placed on the building plan. Columns, docks and fire compartments enter the model. (Conveyor Systems)
  3. Flow model: Conveyor speeds, merges, sorter chutes and operator stations are brought to life. (Sortation Systems)
  4. Scenarios: Average day, peak hour, growth and failure scenarios are run.
  5. Decision and validation: The layout is adjusted to the results. The same model can be used to test the control software.

Which questions does simulation answer?

Digital twins at Exon

Exon first listens to the requirement. Then it prepares a 3D layout before the quotation. The price is based on this layout. When the project requires it, the customer's warehouse is modeled digitally in Demo3D before the project starts. Flow and throughput are checked in simulation. In the project process, the software and simulation step comes before the factory acceptance test (FAT). Mechanical design, production and software are all in-house at Exon (About Us).

6 outputs to ask from a simulation

  1. Input list: Which order data, item mix and peak-hour volume went into the model? Did they come from your data or from assumptions?
  2. Hourly results: Items processed and queue length hour by hour, not a daily average.
  3. Bottleneck map: Where, at what time and how long did waiting occur?
  4. Chute fill levels: Fill rate of each chute and the number of operators needed to clear it.
  5. Scenario comparison: Today's volume, growth and one machine offline, side by side.
  6. Assumptions: What values were assumed for read rate (%), operator speed and downtime?

Common mistakes

Frequently asked questions

What is the difference between a digital twin and simulation?

Simulation tests the flow with assumed data at design stage. A digital twin in the narrow sense is a live copy of the running site. That copy is updated with data from the floor. In warehouse projects the two terms are often used interchangeably.

What data does warehouse simulation need?

It needs the building plan, the order profile and carton data (size, weight, type mix). Peak-hour volume, the chute and destination list and the shift pattern are also required. The more real the data, the more reliable the result.

How is a digital twin built?

First the building and layout are modeled in 3D. Then the equipment's speeds, capacities and business rules are added. Finally, scenarios run with real order data. The results feed back into the design.

Can an existing warehouse be simulated?

Yes. If automation goes into an existing building, columns, docks and remaining equipment enter the model. Manual sorting that continues during the transition can also be tested as a scenario.