Exon Robotics Logo
Transport equipment

What is an AGV?

A driverless vehicle that carries loads along defined routes. This page explains how an AGV navigates. It also covers when an AGV is the right choice and the questions to ask before a project.

In short

  1. What it is: A driverless vehicle that carries loads along defined routes
  2. Where it is used: Pallet and tote transport, feeding from production to the warehouse, end of line, transfers between conveyors
  3. When to choose it: Fixed flow, routes that rarely change, many repetitive moves
  4. Exon's role: Installed and commissioned with the conveyor and sorter lines as part of a turnkey project

Definition

An AGV (automated guided vehicle) is a driverless vehicle that carries loads. In warehouses and factories it moves pallets, totes or carts along predefined routes. It finds its way with magnetic tape, wires or markers on the floor. Lasers and map references can also be used. Fleet management software assigns tasks to the vehicles. The same software manages traffic and charging.

Other names: automated guided vehicle, automatic guided vehicle, AGV robot, driverless transport vehicle.

How does an AGV navigate?

The navigation type sets two things: how flexible the AGV is and how much floor work it needs.

Whatever the navigation type, an AGV follows routes defined in software. If an obstacle appears, the safety scanner slows and stops the vehicle. It waits until the obstacle is gone. This is the key difference from an AMR. An AMR can calculate a new route around the obstacle. An AGV stays on its defined route.

Types of AGV

When is an AGV the right choice?

Which Exon systems does it work with?

Exon designs, installs and commissions AGVs as part of a turnkey project. The vehicles are planned together with conveyors, sorters and storage systems. Vehicle and line can communicate through the warehouse control system (WCS). Exon follows the EN ISO 3691-4 safety standard in AGV projects.

7 questions for an AGV project

  1. What will be carried? Load type (pallet, tote, cart), weight and dimensions define the vehicle. List non-standard pallets from the start.
  2. How many moves per hour? The number of tasks in the peak hour sets the fleet size. Distance and pick-up and drop-off times count too. Do not forget charging time.
  3. Is the floor suitable? Floor flatness, slopes, joints and ramp transitions matter. They affect navigation and load safety.
  4. How will traffic be separated? Crossings of people, forklifts and AGVs are set in the design. Doors and passages are part of this.
  5. Charging strategy: Opportunity charging or battery swap? Opportunity charging means short charges during idle moments. Charger positions must not disrupt the flow.
  6. Integration: Will tasks come from the warehouse management system (WMS) or the control software? The AGV exchanges signals with conveyors, doors and lifts. Define this exchange in writing.
  7. Safety: EN ISO 3691-4 sets safety requirements for driverless industrial trucks. Safety fields, speed limits and the risk assessment should be part of the acceptance test.

Common mistakes

Frequently asked questions

What does AGV stand for?

Automated guided vehicle. Some sources also say automatic guided vehicle.

What is the difference between an AGV and an AMR?

An AGV follows defined routes. It stops and waits at an obstacle. An AMR (autonomous mobile robot) senses and maps its surroundings. It calculates a new route around the obstacle. AGVs suit predictable, fixed flows. AMRs suit areas that change often and are shared with people.

What makes up an AGV system?

An AGV system consists of vehicles and navigation infrastructure. The infrastructure may be tape, markers, reflectors or a map. Fleet management software, chargers and the link to the WMS and control software are also part of it. A vehicle alone is not a system.

Can AGVs be installed in an existing warehouse?

Usually yes. The floor, aisle widths and traffic pattern are reviewed. The navigation type is chosen to match. Vehicles with natural navigation need the least floor or wall work.

Related terms

Let's plan your transport flow together with the line and storage.Share the loads to be moved, the peak-hour task count and your layout. Exon prepares a 3D layout before the quote.

Last updated: